Skip to content

Emergency

A limb down across a tiled roof overnight

  • Emergency make-safe
A failed limb resting across a tiled roof after overnight storms.

A major limb failed in overnight wind and came to rest across the roofline of an occupied house.

The situation

The owners woke to a limb resting across the rear roof. It had torn at the union and was partly supported by the gutter and partly still attached to the parent tree.

What made it difficult

The limb was holding load in two directions. Cutting it in the wrong order would have dropped the weight onto the roof rather than off it, and the only working position was above a paved courtyard.

The approach

The section was roped from the parent stem before any cut was made, then released in three stages so the weight transferred to the rope rather than to the roof. The courtyard was matted and closed off, and the remaining tree was assessed the same visit.

The outcome

The roof was cleared the same day with two broken tiles as the only damage - both already broken by the original failure. Photographs and a written description were provided for the insurance claim, and remedial pruning on the parent tree was scoped separately.

Case study content is a structural placeholder until real project records and photography are supplied.

Same position, same lens

Drag the handle, or use the arrow keys.

After: the completed work at the same location.BeforeAfter
The roofline on arrival and after the limb was removed.

From the job

The exclusion zone set up before any cutting began.
The exclusion zone set up before any cutting began.
The roofline clear, with the remaining tree assessed.
The roofline clear, with the remaining tree assessed.

Similar work

Darwin & surrounds

Different site, same starting point.

Send us photographs and a sentence about what is worrying you. We will tell you what it needs.