Clearing a rear boundary before a fence rebuild

  • Site clearing
  • Two days
A rear boundary being cleared of self-seeded growth.

Twenty years of self-seeded growth along a shared rear boundary, cleared ahead of a fence replacement.

The situation

A shared boundary had grown over with self-seeded species to the point where the existing fence could not be reached, let alone replaced.

What made it difficult

The only access was a 900mm side gate. Material had to come out through the house yard, and the work affected two neighbouring properties who both needed notice.

The approach

Both neighbours were notified in writing before the date. A narrow-access chipper was set up at the gate, and material was processed at the boundary and walked out as chip. Retained trees along the line were identified and protected before clearing started.

The outcome

The full boundary line was cleared and mulched over two days, the fencing contractor started on schedule, and the retained trees were untouched.

Case study content is a structural placeholder until real project records and photography are supplied.

From the job

The chipper positioned at the only available access point.
The chipper positioned at the only available access point.
The cleared boundary line, mulched and level.
The cleared boundary line, mulched and level.

Similar work

Darwin & surrounds

Different site, same starting point.

Send us photographs and a sentence about what is worrying you. We will tell you what it needs.